ACC San Gabriel Building Exterior

ACC San Gabriel

PROJECT DETAILS

Total Project Cost: $200M+
Total Project Size (SF): 106k

BRYCOMM SOW

Project Description:  Mall Renovation
Project Disciplines: Structured Cable, / Video Surveillance / Access Control
Total Project Cost: $1.1M
Duration/Schedule (Months):  12 Months
Manpower:
– Average Crew Size: 8
– Peak Highest Size: 15

Photo credit: American Constructors

ACC San Gabriel Building Exterior

ACC San Gabriel

PROJECT DETAILS

Total Project Cost: $200M+
Total Project Size (SF): 106k

BRYCOMM SOW

Project Description:  Mall Renovation
Project Disciplines: Structured Cable, / Video Surveillance / Access Control
Total Project Cost: $1.1M
Duration/Schedule (Months):  12 Months
Manpower:
– Average Crew Size: 8
– Peak Highest Size: 15

Photo credit: American Constructors

ACC San Gabriel Building Exterior

ACC San Gabriel

PROJECT DETAILS

Total Project Cost: $200M+
Total Project Size (SF): 106k

BRYCOMM SOW

Project Description:  Mall Renovation
Project Disciplines: Structured Cable, / Video Surveillance / Access Control
Total Project Cost: $1.1M
Duration/Schedule (Months):  12 Months
Manpower:
– Average Crew Size: 8
– Peak Highest Size: 15

Photo credit: American Constructors