ACC Round Rock Front Sign

ACC Round Rock

PROJECT DETAILS

Total Project Cost: $200M+
Total Project Size (SF): 100k

BRYCOMM SOW

Project Description: Building 8000 addition to existing campus
Project Disciplines: Structured Cable  / Video Surveillance / Access Control
Total Project Cost: $850k
Duration/Schedule (Months):  12 Months
Manpower:
– Average Crew Size: 6
– Peak Highest Size: 12

Photo credit: SpawGlass

ACC Round Rock Front Sign

ACC Round Rock

PROJECT DETAILS

Total Project Cost: $200M+
Total Project Size (SF): 100k

BRYCOMM SOW

Project Description: Building 8000 addition to existing campus
Project Disciplines: Structured Cable  / Video Surveillance / Access Control
Total Project Cost: $850k
Duration/Schedule (Months):  12 Months
Manpower:
– Average Crew Size: 6
– Peak Highest Size: 12

Photo credit: SpawGlass

ACC Round Rock Front Sign

ACC Round Rock

PROJECT DETAILS

Total Project Cost: $200M+
Total Project Size (SF): 100k

BRYCOMM SOW

Project Description: Building 8000 addition to existing campus
Project Disciplines: Structured Cable  / Video Surveillance / Access Control
Total Project Cost: $850k
Duration/Schedule (Months):  12 Months
Manpower:
– Average Crew Size: 6
– Peak Highest Size: 12

Photo credit: SpawGlass